8fd3 Flex J-Lay tower

Flex J-Lay tower

by: Moszkowski, Mark; Baugh, Benton F.;

A method for j-laying a pipeline from an offshore vessel to the floor of the ocean comprising a multiplicity of winches for supporting the upper end of the pipeline at its natural hanging angle, a mast in a fixed angle to the vessel, holding new pipe section in the mast for welding to the upper end of the pipeline, and flexing the lower end of the new pipe section into alignment with the upper end of the pipeline to allow welding to the pipeline and flexing the remainder of the new pipe section to remain within the mast.

BACKGROUND OF THE INVENTION

Underwater pipelines can be continuously laid from a surface vessel employing S-Lay, Natural J-Lay or Forced Vertical J-Lay mechanical arrangements. Each of these methods have the pipeline being laid approaching the ocean floor in a catenary curve.

S-Lay systems have the pipeline bent back from its near catenary curve to an almost horizontal position where strings of pipes can be added on a vessel deck. Natural J-Lay systems (called J-Lay systems in short) keep the pipeline in its natural near catenary attitude. New pipes have to be brought up at a slanting angle to match the angle of the upper end of the pipeline in the water. Forced Vertical J-Lay systems have the top end of the pipeline bent further from the near catenary curve so as to bring it to a vertical position where new pipes can to be added in a vertical tower.

Both the first and the third type use so-called "stingers" to bend the pipeline to the desired attitude for welding new pipe sections. The second type requires a pipe clamping device sometimes also called improperly a "stinger".

S-Lay arrangements offer the definite advantage of a near horizontal pipeline on vessel deck, allowing in-line multiple welding, testing and coating stations but require long and, in deep water, deep, expensive and relatively fragile stingers to bend the pipe from its natural no moment angle in the water to the near horizontal on the vessel deck.

Forced Vertical J-Lay systems allow the use of fixed vertical pipe laying towers but also require a sometimes very deep stinger. In addition, keeping the stingers within reasonable dimensions sometimes induce plastic deformation of the pipe, or permanent plastic deformation. In large diameter pipelines, the moment required to handle the upper end of the pipeline can be substantial.

Natural J-Lay systems do not require genuine stingers, strictly speaking, but at the cost of a neither horizontal nor vertical laying attitude, thus involving complex articulated towers. Current natural J-Lay arrangements demand the provision of complex upending or erecting strongback arms to bring new pipes or strings of pipes to a non horizontal variable position where they are jointed to the existing deployed pipeline.

The three kinds of arrangements require that the pipeline total weight be supported above deck in clamps or friction tensioners, the weight of the pipe being held back from the bottom or the top of the systems. Whether J-Laying or S-Laying, that provision is a real drawback when the job calls for the installation of large manifolds inline, as the size of the manifold is bound to be limited by the dimensions of the tensioning or weight holding device. In addition, near vertical J-Lay arrangements where the weight of the deployed pipeline is supported from the top of the tower require very strong structures, thus limiting the overall capacity of the system.

Natural J-Lay Systems have historically been designed as modified onshore drilling rigs. Little of the specific marine environment taken into consideration and all operations are carried on above vessel deck level until the pipeline is eventually lowered into the water. Those systems use drawworks, ram-rig type cylinders or near vertical friction pipe tensioners to hold back the weight of the deployed pipeline, strongback pipe erectors to upend new strings of pipe and rotating articulated masts to allow for a variable pipe angle at water level. In addition, some designs integrate mechanical gimballing of the whole system to compensate for weathervaning vessel rotation.

SUMMARY OF THE INVENTION

The object of this invention is to provide a system for laying pipeline from a vessel with a tower at a fixed angle, but allowing the lower end of the new pipe sections to be aligned with the suspended pipeline by flexing the new pipe sections.

A second object of the present invention is to suspend the pipeline with a multiplicity of winches.

A third object of the present invention is to allow weathervaning of the vessel around the suspended pipeline.

Another object of the invention is to suspend the load of the pipeline below the deck of the vessel rather than above the deck of the vessel.

Another object of the invention is to allow for handling of relatively large subsea packages in the work area while handling the load of the pipeline below the working table area.

Another object of the invention is to provide an area to feed relatively short pipe sections into the tower for welding together in the tower.

Another object of the present invention is to provide the ability to lay pipelines at a variety of angles from a fixed angle tower, without requiring the inducement of a moment on the top of the pipeline.

Another object of the invention is to do the required pipe bending on the portion of the pipeline which is not under tension.

BRIEF DESCRIPTION OF THE DRAWINGS

FIG. 1 is a perspective view of a system of this invention.

FIG. 2 is a perspective view of the work table area.

FIG. 3 is a perspective view of the lower section of the mast.

FIG. 4 is a view of the mast from the front of the vessel.









DESCRIPTION OF THE PREFERRED EMBODIMENT

Referring now to FIG. 1, a vessel 1 is shown having mast 2 rigidly attached. A pipeline 3 is suspended into the seawater by winches 4 and 5 cooperating with chains 6 and 7 and with connector 8. The pipeline 3 is also suspended by winches 10 and 11 cooperating with chains 12 and 13 and with connector 14. Connectors 8 and 14 are releasable types as are well known in the industry. The pipeline 3 is lowered by releasing one connector, i.e. 8 and lowering chains 12 and 13 by winches 10 and 11 respectively. While the pipeline 3 is being lowered, the winches 4 and 5 pull chains 6 and 7 up along with connector 8 to the top of its stroke. At that time connector 8 will be relocked and connector 14 will be released and the process repeated. In this type of "hand over hand" operation, the pipeline will be lowered.

New pipe sections 15 and 16 are shown on the deck 17 of vessel 1. New pipe section 18 has been moved to engage a track 19 and is shown swung down into the water as new pipe section 20.

Referring now to FIG. 2, the upper end 25 of pipeline 3 is shown going thru a split work table 26 and thru a split stinger 27. Stingers of conventional designs are usually utilized to assist in bending of the upper end of the pipeline under high tension to allow its alignment with the new pipe section above. In contrast, stinger 27 is utilized only to stabilize the upper end 25 of pipeline 3 for welding. New pipe section 30 has a lower end 31 for welding to the upper end 25 of pipeline 3. As will be discussed later, the new pipe section 30 is flexed to align with the natural position of the upper end 20 of pipeline 3.

New pipe section 35 is shown in an alternate position to new pipe section 30, illustrating the degree of movement which the flexing of the new pipe sections of this invention allows.

Pipe section 18 is shown attached to track 19 and swung down as new pipe section 20 using a connector 40. The new pipe section 20 moves around the track 19 at positions 41, 42, and 43. Finally, the new pipe section is pulled up into the mast 2 as new pipe section 50. When the mast 2 can handle longer new pipe sections than the vessel 1 can weld together from shorter pipe sections, shorter sections can be pulled up into the mast in sequence and welded together generally in the area indicated as 51. In special cases such as when the deck of the vessel can only deliver doubles of pipe and the tower can handle sextuples, 2 preparation welds can be required for every actual pipeline weld. This means that 2 separate pipe stations would be required at 51, or alternately a second weld station can be established part way up the mast 2.

Referring now to FIG. 3, several flexing sections 60, 61, 62, and 63 are shown engaging the new pipe section 30. In flexing section 61, arm 70 engages a pivot point 71 near the front and a circular track 72 at the rear. The arm 70 has a connector 73 attached which can move along the length of arm 70. The movement of arm 70 and connector 73 are remotely controlled to flex the new pipe section 30 to be axially aligned with the upper end 25 of new pipe section 3 and within the area of the tower.

Referring now to FIG. 4, in a conventional tower the upper section of the suspended pipeline is bent to align with the mast. In this invention, the upper end 25 of the pipeline 3 is not bent to align with the mast 2, but rather remains in its natural angle. In the variety of angles available for the pipeline, the upper end of the new pipe section 30 would tend to be a large cone. For a sextuple new pipe section, it would be a very large cone. In this invention, rather than accommodating a very large cone, the mast and the associated arms bends the new pipe section such that the top of the new pipe section is always in the same location. The top of the mast 2 is actually very small rather than a very large cone. This is facilitated because to bend the pipeline under tension below the support point is very difficult. To bend or flex the new pipe section while it is not under tension is much easier.

Referring again to FIG. 1, skid 80 is shown mounted above the support connector 8. This means that the skid 80 can be welded into the pipeline 3 while above the split work table 26. The split work table 26 can be separated along tracks 81 and the skid 80 lowered. The connector 14 can be reattached to the pipeline above the skid 80 allowing the connector 8 to be released and reattached above the skid 80. This process greatly simplifies the process of handling mid-pipeline skids such as 80.

The particular embodiments disclosed above are illustrative only, as the invention may be modified and practiced in different but equivalent manners apparent to those skilled in the art having the benefit of the teachings herein. Furthermore, no limitations are intended to the details of construction or design herein shown, other than as described in the claims below. It is therefore evident that the particular embodiments disclosed above may be altered or modified and all such variations are considered within the scope and spirit of the invention. Accordingly, the protection sought herein is as set forth in the claims below.

Method for preparing microemulsions

Valve timing adjusting device

Extrusion machine

Neck towel and adjustable clasp

Plastic orientation measurement instrument

Soybean cultivar 40064423

Mower deck bumper

Workpiece feeding-ejection mechanism

Isothiazole and isoxazole sulphoxides

Solar thermal propulsion unit

Variable delivery compressor

Security and deployment assembly

Drum construction

Digital character display

Ice body delivery apparatus

Actuator and actuator system

Reversible code compander

Lock for sliding doors

Magnetic blanket for horses

Door clip

Automatic trimming machine

Passive lavatory cleanser dispensing system

Plain bearing

Electromechanical toy

Preparation of star polymers

X-ray lens

Manual floor sweeper

Decoupled integrated circuit package

Glass compositions

Electromechanical preparation of photoengraving cylinders

Gypsum-cement system for construction materials

Golf club stand device

Catalyzed fluorination of chlorocarbons

Process for decoking catalysts

Pulse width modulation operation circuit

Floating inlet tube

Oxide-superconduction grain boundary tunneling device

Hard surface detergent composition

Window sash

Dual chamber water filter

Wearable display

Method for purifying acetone

Sod cutter

Compartmentalized basket truck

Gravity particle separator

Endoscope signal level control

Thread wound golf ball

Nitrogen detection

Digital phase comparison apparatus

Direct conversion receiver per-selection

Movement detector

Splash guard

Simultaneous production of higher chloromethanes

Sulfonium salt compounds

Asymmetric wire rope isolator

Tissue anchoring system and method

Motor vehicle gearbox

Electronic voting machine

Antimicrobial cationic peptides

Metering apparatus

Heterocyclic-methylene-penems

Surface modifier composition

Front vehicle body structure

4-Aminoaliphatic-2,3,5,6-[dibenzobicyclo[5.1.0]octanes] and salts thereof

Pharmaceutically active morpholinol

Non-aqueous electrochemical cell

Incontinence electrode apparatus

Thin layer ablation apparatus

Internal combustion engine

Printer control system

Probing with backside emission microscopy

Thin floss brush

Motor control system

Display hook system

Sliding exhaust brake system

0